BNBGeneral Contracting
— Civil & Infrastructure Contractor
BNB
GENERAL CONTRACTING

The groundwork Abu Dhabi is built on. Roads, concrete, kerbs and ducts — self-delivered with our own crews and plant.

Note 01 — own crews · own plant.
No sub-subcontract chains between
us and the work.
Established
2020
Trade Licence
CN-3743392 · AUH DED
Certified
ISO 9001 · 14001 · 45001
Base of Operations
Abu Dhabi · UAE

Infrastructure Works · Rebar · Formwork · Concrete · Manholes & Chambers · Concrete Barriers · Interlock Paving & Kerbstone · Bridge Approach Slabs · Pedestrian Courts & Walkways · Park Tanks & Utility Structures · Cable Protection & Utility Ducts

SHT 01 / 08 — About BNB

We do the work
under the work.

BNB General Contracting is an Abu Dhabi civil & infrastructure contractor. We build the works that sit under and around the headline projects — the roads, the utilities, the concrete, the kerbs, the ducts.

Established in 2020, we work as a specialist subcontractor to the UAE’s leading developers and main contractors. We turn up with our own crews and our own plant, we work to the drawings and the specification, and we hand the package over on programme.

Our systems are independently certified to ISO 9001, 14001 and 45001 — quality, environment, and health & safety.

Site note — nothing on our sites is improvised.
Established
2020
Discipline
Civil & Infrastructure
Delivery model
Own crews & own plant
SHT 02 / 08 — Scope of Works

Scope of works

RefDescription
W-01All types of infrastructure works
W-02Reinforcement steel fixing · formwork · concrete pouring
W-03Manholes & chambers — construction & installation
W-04Concrete barrier installation
W-05Interlock paving & kerbstone installation
W-06Bridge approach slabs
W-07Pedestrian courts & walkways
W-08Park tanks & utility structures
W-09Cable protection & existing / future utility ducts
W-10Bored cast in-situ piles & light-pole foundations
W-11Stormwater networks, inlets, manholes & chambers
W-12Cast in-situ RC frame — foundations, columns, beams & slabs

General — all packages executed with own manpower, equipment and technical expertise, to project specifications, quality standards and HSE requirements.

SHT 03 / 08 — Delivery Sequence

Our approach

Every package runs the same controlled path — the main contractor always knows what happens next.

01

Enquiry & Tender

We review the drawings and specification, price the package honestly, and prequalify against your requirements.

02

Mobilise

Our own crews and plant arrive site-ready with method statements, RAMS and a programme aligned to yours.

03

Execute & Control

Self-delivered works under documented QA/QC and HSE control, reported against the baseline — no surprises.

04

Handover

The package handed over to specification, on programme, snag-closed and fully documented.

SHT 04 / 08 — The Company at a Glance
AED 6.1M
Subcontracts awarded
35
Subcontract orders
115
Total workforce
18
Plant & vehicle units

Awarded value — 35 subcontract orders and variations across 8 projects, February 2024 to July 2026, excluding VAT. Workforce and fleet at August 2026. Every figure is backed by an order or a payroll on file.

SHT 05 / 08 — Project Record

Project record

Discuss your project
DWG No. P-01 · Abu Dhabi22 orders · 2024–26

Cycle Track — Routes 3 & 4

ClientAldar Projects
ConsultantAtkinsRéalis
Main Contr.Gulf Contractor Company (GCC L&D)
BNB ScopeConcrete barriers; utility protection and road-crossing ducts; RC protection slabs to existing GRP mains; bridge and ramp approach slabs; bored cast in-situ piles to street-light foundations; stormwater inlets and 300 mm UPVC networks; high-end fence foundations; kerbstone
AwardedAED 2,922,930
DWG No. P-02 · DDP Abu Al Abyad, Abu DhabiAED 1.34M · 2026

X Range Infrastructure

Main Contr.ETIMAD House Engineering Contracting
OrderPO-261244 · 29 July 2026
BNB ScopeCast in-situ reinforced concrete — blinding, foundations, columns, beams, raft and suspended slabs. Shuttering erected and struck, steel fixed, concrete placed, vibrated, finished and cured
AwardedAED 1,343,135 · 4,553 m³
DWG No. P-03 · Abu Dhabi3 orders · 2024–25

Khalidiya Park

ClientDept. of Municipalities & Transport
Main Contr.Gulf Contractor Company (GCC L&D)
BNB ScopeCast in-situ RC foundations to large shade structures, pergolas and vertical shades — steel fixing, formwork and C40/20 concrete
AwardedAED 555,575
DWG No. P-04 · Abu DhabiUnder contract · 2026

Reem Hills — Al Reem Island

ClientModon Properties
EngineerAECOM
Main Contr.Barari Natural Resources LLC
BNB ScopePaver, tactile paver, kerbstone, banding and sub-base installation — public-realm hardscaping, Phase 1 and Phase 2
AwardedAED 451,367
DWG No. P-05 · Abu Dhabi2 orders · 2024

4-Parks — Shakhbout City

Main Contr.Gulf Contractor Company (GCC L&D)
BNB ScopeBored cast in-situ piles to street-light pole foundations (124 Nr, 700 mm dia) with pile caps; kerbstone, blinding and haunching; paver installation
AwardedAED 400,170
SHT 05 / 08 — On Site

Works in progress

Roadside RC structure — wall formwork, raking props and starter reinforcement, with traffic management maintained to a live carriageway.
01Roadside RC structure — wall formwork, raking props and starter reinforcement, with traffic management maintained to a live carriageway.
In-situ reinforced concrete chamber — wall formwork erected and top-slab reinforcement fixed, ready for pour.
02In-situ reinforced concrete chamber — wall formwork erected and top-slab reinforcement fixed, ready for pour.
Paver, kerbstone and banding installation to a screeded bed — Al Reem Island.
03Paver, kerbstone and banding installation to a screeded bed — Al Reem Island.
Twin-face formwork and reinforcement to a continuous linear in-situ concrete structure.
04Twin-face formwork and reinforcement to a continuous linear in-situ concrete structure.
Completed in-situ RC chamber with starter bars and cast-in fixings, ready for backfill.
05Completed in-situ RC chamber with starter bars and cast-in fixings, ready for backfill.
Completed public-realm paving and kerb edging, handed over to line and level — Al Reem Island.
06Completed public-realm paving and kerb edging, handed over to line and level — Al Reem Island.
SHT 06 / 08 — Certifications

Independently audited

Assessed and certified September 2025 — valid to 23 Sep 2028.

Standard
ISO 9001:2015
Quality Management
CERT 305025092426Q
Standard
ISO 14001:2015
Environmental Mgmt
CERT 305025092428E
Standard
ISO 45001:2018
Health & Safety
CERT 305025092427HS

Scope — Building & Civil Contracting · Certified 24 Sep 2025

SHT 07 / 08 — General Notes

General notes

G-01

Triple ISO-certified

9001, 14001 & 45001 — quality, environment and health & safety, independently audited.

G-02

Prequalified on marquee jobs

Delivering on Aldar, Modon and Department of Municipalities & Transport developments through their main contractors.

G-03

We self-deliver

Own crews, own plant. No daisy-chain of sub-subcontractors between us and the work.

G-04

QA/QC & HSE, run properly

Documented quality control and a safety culture that holds up to a site audit.

G-05

On time, on specification

Realistic programmes and disciplined delivery against the baseline.

G-06

Easy to build with

Responsive, accountable, and straight with the main contractor. No games.

Delivering through main contractors on Aldar, Modon and Department of Municipalities & Transport developments.

— Who we build for

Aldar · Modon · Dept. of Municipalities & Transport · ETIMAD House Engineering · AECOM · Ghantoot Group · Trojan Construction · Barari Natural Resource · Al Ahad Contracting · Reem Capital · RMB Group · Royal Tech · DX Contracting · GCC (L&D)

SHT 08 / 08 — Enquiries

Let’s talk work.

Send us the drawings and the scope. We’ll price the package and come back with a clear, buildable proposal.

Mobile / WhatsApp
+971 50 962 1126
Web
www.bnbgc.ae
Office
Office No. 2, Bani Yas East, Al Tahaluf Street, Sector 30, Abu Dhabi
Working hours — Sun–Thu, 8:00 AM – 6:00 PM